TEP logo

Case Study

50% Productivity Boost at Tucson Electric Power

To support its extensive network of substations and transmission lines, Tucson Electric Power required a fast, accurate parts retrieval system to keep operations running seamlessly. LD Systems designed a high-capacity solution to streamline parts handling, ensuring critical components reached repair crews efficiently.

Results summary

Reduction in retrieval time
0 %

Improved accuracy

0 %

Productivity boost

0 %

Topics Discussed:

  • Layout and design 
  • Project management services
  • Budget-friendly retrieval equipment selection 
  • Timeline-sensitive equipment installation for small to medium-sized facilities.
  • Implementing AS/RS solutions for a medium-sized organization 
  • Parts handling optimization to supply extreme demand 
  • Picking efficiency for small-to medium-sized operations 
  • Streamlining processes and part delivery between the facility and on-site operations in the southwestern United States 

Full Details and Results

Complete the following form to receive access to the full case study.