TEP logo

Case Study

50% Productivity Boost at Tucson Electric Power

To support its extensive network of substations and transmission lines, Tucson Electric Power required a fast, accurate parts retrieval system to keep operations running seamlessly. LD Systems designed a high-capacity solution to streamline parts handling, ensuring critical components reached repair crews efficiently.

Results summary

Reduction in retrieval time
0 %

Improved accuracy

0 %

Productivity boost

0 %

Full Details and Results

Complete the following form to receive access to the full case study.